FEDERAL26d left

Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys

Fort Worth District

Posted Sep 4, 2026

Deadline
Oct 6, 2026
26 days remaining
Amount
$300K – $1.7M
Status
Open
Geographic Scope
National

Description

<p><strong>NOTE:</strong> A complete study proposal and proposed budget are not requested at this time.&nbsp;</p><p><br></p><p><strong>NOTE:</strong>&nbsp;The established CESU indirect rate is 17.5%. For any Cooperative Agreement entered into in response to this RSOI, a maximum 17.5% indirect cost rate will be paid on work covered by such agreement or any modifications thereto. Unless the agreement specifies otherwise, the basis of direct costs against which the agreement’s indirect cost rate is applied must be either the same base identified in the recipient's federally negotiated indirect cost rate agreement or, if the recipient does not have a federally negotiated indirect cost rate agreement, the Modified Total Direct Cost (MTDC) base.</p><p><br></p><p><strong>TITLE OF PROJECT:</strong> Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys</p><p><br></p><p><strong>SYNOPSIS OF PROJECT:</strong> This project will support the U.S. Army Corps of Engineers (USACE) Jacksonville District by performing Aerial Electromagnetic (AEM) surveys to understand the current spatial extent and rate of saltwater intrusion in the ground and surface waters of the southern Florida Everglades. Results will be integrated with previous survey data conducted over the last 30 years to comprehend the impacts surrounding significant critical habitat loss. Future freshwater-saltwater interface trends will then be estimated to optimize management decisions tied to restoration efforts of the degraded wetland system.</p><p><br></p><p><strong>PERIOD OF PERFORMANCE</strong>: The Base Period of the agreement will extend 12 months from date of award.&nbsp;Four 12-month Follow-on Periods are anticipated based on availability of funding.</p><p><br></p><p><strong>SUBMISSION OF STATEMENT OF INTEREST</strong></p><p>• Statements of Interest (SOI) are due by Noon Central Time, 06 October 2026 via email to the parties listed below.</p><p>• Direct questions no later than Noon Central Time, 14 September 2026 via email to the parties listed below.</p><p>Cheryl R. Vendemia</p><p>Grants Specialist</p><p>USACE Fort Worth District</p><p>Email: Cheryl.R.Vendemia@usace.army.mil</p><p>and</p><p>Nicole Baker</p><p>Project Manager</p><p>USACE Fort Worth District&nbsp;</p><p>Email: Nicole.D.Baker@usace.army.mil</p><p><br></p><p><strong>Timeline for Review of Statements of Interest:</strong> RSOIs are required to be posted on www.Grants.gov for 30 days prior to the Government making a decision and requesting full proposals.&nbsp;&nbsp;</p><p><br></p><p>Refer to RSOI Package for complete details.&nbsp;<strong>&nbsp;Award is anticipated in Fiscal Year 2027.&nbsp;</strong></p><p><br></p>

AI Summary

This opportunity funds Aerial Electromagnetic surveys to assess saltwater intrusion in the groundwater and surface waters of the Everglades, aiming to inform restoration efforts for the wetland ecosystem. Eligible applicants include organizations that can submit a Statement of Interest by October 6, 2026, as part of a cooperative agreement with the U.S. Army Corps of Engineers.

Funding Details

Minimum Award
$300,000
Maximum Award
$1,657,690

Key Dates

Posted: Sep 4, 2026Deadline: Oct 6, 2026

Quick Facts

CFDA Number
12.005
Funder Type
Federal Agency
Grant Level
FEDERAL
Last Verified
Sep 4, 2026

Geographic Scope

national

ReferenceGL-074DEB

074debf1-5abd-4386-b08d-56ad32b322f5

Intelligence

Ready to apply?

Visit the funder's website to start your application.